Botswana Energy Regulatory Authority
National oversight — licences, audits, enforcement across all carriers & OMCs.

Depot Loading Authorisation

The pre-load gate — no tanker is loaded unless every compliance pre-condition is met.

Loading request

Diesel · UN 1202
Night driving (18:00–06:00) is prohibited per COHE-PS-40 §4.16.
Compliance score100%
LOADING AUTHORISED
All pre-conditions met — cleared to load.
B 482 BGT
Botswana Oil Logistics

Pre-load compliance checks

Tanker approval statuscritical
Register status: Approved
OK
Product / vessel compatibilitycritical
Diesel approved for this vessel
OK
Tank calibration certificatecritical
Valid to 2027-03-14
OK
Hydrostatic testcritical
Valid to 2026-11-02
OK
BERA transport permitcritical
Valid to 2026-09-30
OK
Goods-in-Transit insurance
Valid to 2026-12-31
OK
Pre-despatch inspectioncritical
PS-INS-26-0418 passed (cert valid to 2026-09-18)
OK
Driver competency (PrDG · DG training · medical)critical
O. Tau: all credentials valid
OK
Safe Loading Passcritical
SLP-26-0481 valid to 2026-10-15
OK
Driver fatigue / hours-of-servicecritical
O. Tau: within hours-of-service limits
OK